Other information:
Removal
NOTE:
Removal steps in this procedure may contain installation details.
With the vehicle in NEUTRAL, position it on a hoist.
Refer to: Jacking and Lifting - Overview (100-02 Jacking and Lifting, Description and Operation).
Remove and discard the nuts.
Torque:
35 lb.ft (48 Nm)
Position aside the muffler and tailpipe.
..
Special Tool(s) /
General Equipment
303-1567Sizer, Teflon SealTKIT-2010C-FLM
307-005
(T59L-100-B)
Slide Hammer
310-205Fuel Injector Brush
310-206Remover, Fuel InjectorTKIT-2009A-FLM
310-206-01Adapter for 310-206
310-207Installer, Fuel Injector Seal AssemblyTKIT-2009A-FLM
Removal
Release the fuel system pressure.
Refer to: Fuel System Pr..